Delta Dental of Michigan — Ultraline™ Custom Packaged Rooftop System
Delta Dental of Michigan wanted to be environmentally conscious in their extensive headquarters expansion to achieve LEED Gold certification; Ultraline Custom-Packaged Rooftop Systems with evaporative condensing direct expansion systems, FANWALL TECHNOLOGY, and high-efficiency boilers helped accomplish this goal.
Read MoreDell Children’s Medical Center
A Temtrol-brand air handler provides ventilation for the 6,500 sq. ft. MRI operating suite of Dell Children’s Medical Center, meeting stringent environmental requirements for a surgical operating room.
Read MoreCommercial Office Building — Retrofit with FANWALL TECHNOLOGY®
A commercial office building needed to replace six aging air handlers; the larger single or dual fan AHUs were replaced with Nortek Air Solutions' knockdown units with multiple FANWALL arrays.
Read MoreCollege of Nanoscale Science and Engineering
Nortek Air Solutions supplied a Ventrol-brand sectional rooftop air handler for a cleanroom installation on campus.
Read MoreChicago Board of Trade — FANWALL® Retrofit
Rising maintenance costs and the higher probability of an HVAC system failure provided ample support for replacing aging builtup air handlers installed in 24th floor mechanical rooms with a modular fan array system using FANWALL TECHNOLOGY.
Read MoreSchermerhorn Symphony Center
Custom air handlers at Schermerhorn Symphony Center in Nashville were damaged beyond repair in a flood, then replaced with knock-down air handlers with FANWALL TECHNOLOGY which were brought into the space in individual
pieces through an existing outdoor air opening 20 feet below grade.
Read MoreImproving Air Handler Reliability at Carolinas Medical Center
The hospital replaced two vaneaxial fan systems in the penthouse air handlers with a new FANWALL array for both supply and return airstreams, providing improved reliability and energy efficiency.
Read MoreBlue Cross Blue Shield — FANWALL® Retrofit
To improve the reliability and energy efficiency of the system, BCBS replaced the single DWDI fan on the supply side and the stacked vaneaxial fans on the return side for each of their north and south systems with new FANWALL® arrays.
Read MoreBattle Creek Central High School
Venmar-brand EnergyPack air handlers with integrated ground source heat pumps, some with enthalpy wheels, were installed in Battle Creek Central High School.
Read MorePlaster Student Union
Plaster Student Union unites the Missouri State University campus by providing a central hub for students, faculty, staff, and visitors alike. It affords several amenities including offices, food service, retail, conference rooms and entertainment spaces. The facility underwent a retrofit capital improvement to its single air handling unit. A Nortek Air Solutions FANWALL® array was installed along with replacing the heating and cooling coils; thereby mitigating the risk of unreliable air handling operation and rapid growth of expenses through component replacement.
Download PDF
- « Previous
- 1
- 2
- 3
- Next »