OSHPD Certification – Largest Coil Ever Tested
Nortek Air Solutions submitted a coil for OSP testing that measured 184 inches long, 114 inches high, 15 inches wide and contained ~169.7 gallons of water. It weighed in at 9,218 pounds. The coil was mounted on the largest earthquake testing equipment in North America. With enough force exerted to validate compliance, the Nortek Air Solutions coil passed testing with virtually no damage.
Download PDF
Dallas College Construction Sciences Building
Nortek Air Solutions partnered with Dallas College on a new Construction Sciences Building (CSB) to boost construction trades workforce development.
Read MoreSemiconductor Leader Retrofits Decommissioned Building for Cleanroom Spaces
This semiconductor industry leader identified a decommissioned building to be re-purposed and retrofitted including expanded Class 1000/ISO 6 cleanroom space. The client needed a partner that can deliver a new cleanroom ceiling design, as well as Automated Material Handling Systems (AMHS) loads that were not part of the original building. To avoid substantially higher greenfield design and construction costs, the client needed a cleanroom partner that could substantially retrofit the cleanroom ceiling system in a challenging space.
Download PDF
Transamerica Pyramid
Thanks to replacing the aging air handler fans, tenants and building management now benefit from a much quieter system, redundancy to avoid downtime and a savings of 80,000 kWh in energy consumption that resulted in an $11,000 rebate from Pacific Gas & Electric.
Read MoreHospital’s New Children Cardio Surgery ORs Incorporate State-of-the-Art HVAC System Design
Orlando’s Nemours Children’s Hospital ORs use custom air handlers with dual low temperature coils, UV and HEPA filtration, energy wheel, fan walls and other cutting-edge features,
Read More- « Previous
- 1
- 2
- 3