4 Topics Trending at SEMICON West

Here are the top four trends leaders across the semiconductor industry attending SEMICON West identified, and how they are navigating them.
Read More

Cleanroom Construction: Navigating The CHIPS Act Impact

With the passing of the CHIPS Act (Creating Helpful Incentives to Produce Semiconductors for America), the U.S. is forecasted to grow its capabilities in critical technology segments, such as leading-edge fabrication, DRAM memory, analog, and advanced packaging. The recent Semiconductor Industry Association’s recent report states the U.S. capacity for advanced logic will grow from 0%…
Read More

Join us at SEMICON West July 9–11

Join Nortek Air Solutions CleanSpace as our guest at SEMICON West + FLEX 2024 July 9–11, Moscone Center, San Francisco.
Read More

Cleanroom Solutions Webinar: Design and Build

As seen in Cleanroom Technology’s webinar series.  
Read More

Kleinhans Music Hall

Nortek Air Solutions’ AHU customization and sound attenuation help Kleinhans Music Hall replace its 83-year-old HVAC system.
Read More

Vanderbilt University Engineering Sciences Building

Nortek Air Solutions supplied two identical large Ventrol-brand energy recovery units.
Read More

City of Unalaska

Governair was chosen as project supplier because of its proven flexibility in design and its experience packaging air handlers for unique applications.
Read More

Sutter Roseville Medical Center

FANWALL arrays resulted in a 43 percent drop in energy use delivering same airflow as the old vaneaxial fan.
Read More

Hilton San Francisco

Hotel operators now benefit from a much quieter system, redundancy to avoid downtime and energy savings that resulted in a $13,000 rebate from Pacific Gas & Electric.
Read More

Stony Brook University Medical Center

Nortek Air Solutions custom engineered a Ventrol-brand knock-down AHU design with a FANWALL array of 9 fans— 3 as backup and 6 active fans, delivering a total of 31,800 cfm.
Read More