
City of Unalaska
Governair was chosen as project supplier because of its proven flexibility in design and its experience packaging air handlers for unique applications.
Read More
Sutter Roseville Medical Center
FANWALL arrays resulted in a 43 percent drop in energy use delivering same airflow as the old vaneaxial fan.
Read More
Hilton San Francisco
Hotel operators now benefit from a much quieter system, redundancy to avoid downtime and energy savings that resulted in a $13,000 rebate from Pacific Gas & Electric.
Read More
Stony Brook University Medical Center
Nortek Air Solutions custom engineered a Ventrol-brand knock-down AHU design with a FANWALL array of 9 fans— 3 as backup and 6 active fans, delivering a total of 31,800 cfm.
Read More
As Seen in Clean Air and Containment Review Journal
There are many considerations when designing a cleanroom ceiling system and this article sets out to list and explain the most important.
Read More
John E. Jaqua Academic Center
Rooftop EnergyPack® air handling units help the University of Oregon provide advanced comfort to student athletes in their new academic support center.
Read More
Encore Wire Sustainable R&D Center
A Temtrol-brand air handler with a six fan FANWALL array overcame many challenges including stringent energy efficiency requirements and a constrained unit footprint for a new 13,000 sq. ft. research and development center designed for LEED Platinum certification.
Read More
USC Michelson Center for Convergent Bioscience
Nortek Air Solutions supplied a complete cleanroom package including flooring, walls, finishes and protocol management for the USC Michelson Center for Convergent Bioscience.
Read More
Delta Dental of Michigan — Ultraline™ Custom Packaged Rooftop System
Delta Dental of Michigan wanted to be environmentally conscious in their extensive headquarters expansion to achieve LEED Gold certification; Ultraline Custom-Packaged Rooftop Systems with evaporative condensing direct expansion systems, FANWALL TECHNOLOGY, and high-efficiency boilers helped accomplish this goal.
Read More
Dell Children’s Medical Center
A Temtrol-brand air handler provides ventilation for the 6,500 sq. ft. MRI operating suite of Dell Children’s Medical Center, meeting stringent environmental requirements for a surgical operating room.
Read More